CEMENT


PORTLAND CEMENT 42.5
 
Our headquarters in London | UK & Spain  have the ability, to supply Portland Cement 42.5

SPECIFICATIONS


Formula 42.5 R 


CHEMICAL ANALYSIS

  • Formula 42.5 R Typical Analysis
  • SiO3 Silicon Dioxide 21.00 %
  • Al2O Aluminum Oxide 5.30 %
  • Fe2O3 Ferric Oxide 3.30 %
  • CaO Calcium Oxide 65.60 %
  • MgO Magnesium Oxide 1.10 %
  • SO3 Sulphur Trioxide 2.70 %
  • LOI Loss Of Ignition 0.90 %
  • C3A Tricalcium Aluminates 60 %
  • C3S Tricalcium Silicate 60.00 %
  • C2S Dicalcium Silicate 15.00 %
  • C4AF Tricalcium Aluminous Ferric 9.76 %
PHYSICAL TESTS
  • Blaine fineness m² kg360 300 – 380
  • Air content 7.1  12
  • 03 - Days 27 / 22 - 31
  • 28 - Days 54 / 46 - 56 
  • Initial Setting Time (Vicat Test) 135 Min / 70 - 150
  • Final Setting Time (Vicat Test) 210 Min / 130 – 300
  • Palse Set Paste 86 / 50 min 

Formula 42.5 N  

CHEMICAL ANALYSIS                                                         
  • SiO2 Silicon Dioxide 21.00 %                                         
  • Al2O Aluminum Oxide 5.30 %                                        
  • Fe2O3 Ferric Oxide 3.30 %                                            
  • Fe2O3 Ferric Oxide 3.30 %                                            
  • CaO Calcium Oxide 65.60 %                                          
  • MgO Magnesium Oxide 1.10 %                                      
  • SO3 Sulphur Trioxide 2.70 %                                         
  • LOI Loss Of Ignition 0.90 %                                            
  • C3A Tricalcium Aluminates 8.05 %                                 
  • C3S Tricalcium Silicate 60.00 %                                     
  • C2S Dicalcium Silicate 15.00 %                                      
  • C4AF Tricalcium Aluminous Ferric 9.76 %
PHYSICAL TESTS                                              
  • 2 Blaine 3.250 Cm/g Compressive Strength                   
  • 03 - Days 230 N/mm KG/CM2                                       
  • 07 - Days 305 N/mm KG/CM2                                       
  • 28 - Days 420 N/mm KG/CM2                                         
  • Initial Setting Time (Vicat Test) 105 Min                        
  • Final Setting Time (Vicat Test) 135 Min
We need only that you answer these few questions to send to you a draft offer.
  • Type of cement requested
  • Type of bags requested
  • Quantities per month
  • Size of vessels
  • Unloading port and unloading rate
  • Target price in CIF basis